Calancasca AG

High-pressure storage power station in the Calanca Valley

Calancasca AG, which is based in Roveredo (GR), is co-owned in equal stakes by Centralschweizerische Kraftwerke AG and Elektrizitäts-Gesellschaft Laufenburg AG.

The facilities at the Calancasca AG power station were built between 1949 and 1951. The 54 m high dam, a gravity dam in the narrow gorge of the Calancasca near Weiler Molina (Buseno local authority), forms the Molina weekly balancing reservoir with a top water level of 686.75 m above sea level and a capacity of 640,000 m3. Water is collected flowing from the unglaciated catchment of the Calancasca below Valbella, over an area of 90 km2, and fed through the pressure tunnel/shaft of the two machine groups in the Sassello underground central station (Roveredo local authority) about 400 m below.

The mean annual production is 87m kWh, with 30m kWh generated in the cold half of the year and 57m kWh generated during the warm half of the year. The machine groups operate at full load (high-pressure run-of-river power station) when the snow melts.

The managerial mandate is held by Axpo Hydro Energy.

Calancasca AG
Facts & figures
Mean annual production:87m kWh
Installed output:20 MW
Turbines:2 twin-nozzle, horizontal-axis Pelton turbines, 10 MW each
Water reservoir:Molina reservoir with a 640,000 m3 usable storage capacity

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Christoph Huber wird neuer Leiter Human Resources

February 8, 2012

Christoph Huber ist zum neuen Leiter Human Resources der Axpo Holding AG ernannt worden. Er tritt die Nachfolge von Martin Lüthy an. C. Huber wechselt voraussichtlich auf den 1. 8. 2012 von der UBS AG Zürich zur Axpo Holding AG.

more...

E-world 2012: EGL stellt Kundengeschäft mit strukturierten Produkten vor

February 6, 2012

Industrie- und Stromversorgungsunternehmen sichern sich zunehmend gegen volatile Strom- und Gaspreise ab. Möglich machen dies massgeschneiderte Produkte und Lösungen, wie sie die EGL vom 7. bis 9. Februar an der E-World in Essen präsentiert.

more...

Höherer Jahresgewinn – leicht tiefere Energieerzeugung

January 27, 2012

Die Kraftwerke Linth-Limmern AG (KLL) haben im Geschäftsjahr 2010/11 einen Jahres-gewinn von 6.316 Mio. CHF erzielt. Die Energieerzeugung fiel mit 403 Mio. kWh leicht geringer aus als im Vorjahr.

more...