HomepageNavigationPage ContentContactSitemapSearchMain Navigation
hydroenergie_content_en_746x135

Kraftwerke Ilanz AG

Storage and run-of-river power station in the Anterior Rhine Valley

Ilanz/Glion (GR)-based Kraftwerke Ilanz, which were built from 1984 to 1992, is a plant which is co-owned by the Graubünden cantonal authority, the concession authorities and Axpo AG. The 50m franc share capital is divided as follows: 85% Axpo AG, 10% cantonal authority, 5% concession authorities.

ZoomIlanz

The two independent power station stages, Panix and Tavanasa, use the inflow in the catchment area of the Anterior Rhine, as well as part of the turbined water from Kraftwerke Vorderrhein (Anterior Rhine Power Stations). The Panix reservoir is used primarily for the purposes of daily and weekly compensation. With an output of 87 MW, Kraftwerke Ilanz permit energy to be produced adapted in line with requirements. It produces a mean of around 280m kWh of electricity every year.

Hydro Surselva AG sees to the operational running of the installations. The managerial mandate is held by Axpo Hydro Energy.

Facts & figures
Annual production:280m kWh
Total installed output:87 MW
Panix power station stage
Annual production:130 Mio. kWh
Installed output:52,5 MW
Turbines:1x 52.5 MW Pelton turbine
Water reservoir:Panix reservoir with 7.3m m3 of usable storage capacity
Tavanasa power station stage
Annual production:150m kWh
Installed output:34.5 MW
Turbines:2 Francis turbines, 17.25 MW each
Flow rate:50 m3/s

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Christoph Huber wird neuer Leiter Human Resources

February 8, 2012

Christoph Huber ist zum neuen Leiter Human Resources der Axpo Holding AG ernannt worden. Er tritt die Nachfolge von Martin Lüthy an. C. Huber wechselt voraussichtlich auf den 1. 8. 2012 von der UBS AG Zürich zur Axpo Holding AG.

more...

E-world 2012: EGL stellt Kundengeschäft mit strukturierten Produkten vor

February 6, 2012

Industrie- und Stromversorgungsunternehmen sichern sich zunehmend gegen volatile Strom- und Gaspreise ab. Möglich machen dies massgeschneiderte Produkte und Lösungen, wie sie die EGL vom 7. bis 9. Februar an der E-World in Essen präsentiert.

more...

Höherer Jahresgewinn – leicht tiefere Energieerzeugung

January 27, 2012

Die Kraftwerke Linth-Limmern AG (KLL) haben im Geschäftsjahr 2010/11 einen Jahres-gewinn von 6.316 Mio. CHF erzielt. Die Energieerzeugung fiel mit 403 Mio. kWh leicht geringer aus als im Vorjahr.

more...