Kraftwerke Vorderrhein AG

Storage power station in the Bündner Oberland region of Graubünden

Disentis/Mustér (GR)-based Kraftwerke Vorderrhein (Anterior Rhine Power Stations, KVR), which were built from 1962 to 1968, is a plant which is co-owned by the Graubünden cantonal authority, the concession authorities and Axpo AG.

The 80m franc share capital is divided as follows: 81.5% Axpo AG, 10% Graubünden cantonal authority and 8.5% concession authorities.
The KVR power stations are used to produce peak-load energy, adapted to meet consumption requirements, thanks to their rapid availability and their large output capacity (331 MW). The two power stations, Sedrun and Tavanasa, use the water inflow from a catchment of around 316 km2 in the Anterior Rhine and its tributaries through to Tavanasa. It produces a mean of 790m kWh every year.

ZoomVorderrhein

Hydro Surselva AG sees to the operational running of the installations. The managerial mandate is held by Axpo Hydro Energy.

Facts & figures
Mean annual production:790m kWh
Total installed output:331 MW
Sedrun power station
Annual production:250m kWh
Installed output:151 MW
Turbines:3 horizontal-axis Pelton turbines, each 50 MW 1 Kaplan turbine, 750 kW (running gear)
Water reservoir:

Curnera reservoir with 40.8m m3 of usable storage capacity

Nalps reservoir with 44.5m m3 of usable storage capacity

Stausee Sta. Maria mit 67,0 Mio. m3 nutzbarem Speicherinhalt

The three reservoirs, which have a total usable capacity of 152m m3, are combined to create one water management system.

Tavanasa power station
Annual production:540m kWh
Installed output:180 MW
Turbines:4 horizontal-axis Pelton turbines, each 45 MW
Water reservoir:Runcahez compensating basin in the Somvixer Valley with a usable storage capacity of 0.436m m3

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Christoph Huber wird neuer Leiter Human Resources

February 8, 2012

Christoph Huber ist zum neuen Leiter Human Resources der Axpo Holding AG ernannt worden. Er tritt die Nachfolge von Martin Lüthy an. C. Huber wechselt voraussichtlich auf den 1. 8. 2012 von der UBS AG Zürich zur Axpo Holding AG.

more...

E-world 2012: EGL stellt Kundengeschäft mit strukturierten Produkten vor

February 6, 2012

Industrie- und Stromversorgungsunternehmen sichern sich zunehmend gegen volatile Strom- und Gaspreise ab. Möglich machen dies massgeschneiderte Produkte und Lösungen, wie sie die EGL vom 7. bis 9. Februar an der E-World in Essen präsentiert.

more...

Höherer Jahresgewinn – leicht tiefere Energieerzeugung

January 27, 2012

Die Kraftwerke Linth-Limmern AG (KLL) haben im Geschäftsjahr 2010/11 einen Jahres-gewinn von 6.316 Mio. CHF erzielt. Die Energieerzeugung fiel mit 403 Mio. kWh leicht geringer aus als im Vorjahr.

more...